Gading Kusuma Drain Normalized
access_time October 12 2016 10:21 AM remove_red_eye 1195
Reported by Aldi Geri Lumban Tobing | Translated by Nugroho Adibrata
Reported by Aldi Geri Lumban Tobing | Translated by Nugroho Adibrata
The Gading Kusuma Drain that located on Jl Perintis Kemerdekaan, Kelapa Gading Timur Urban Village, Kelapa Gading Sub-district is normalized. After it is completed, the next step is sheet pile reparation at the same place.
160 meters will be carried out for the broken sheet pile and 33 meters for its elevation as high as 40 centimeters
Section Head of Water Management for Kelapa Gading Sub-district, Rukmana disclosed normalization is carried out up to 585 meters and will be deepened up to 80 centimeters. While for sheet pile reparation, will be done up to 193 meters.
"160 meters will be carried out for the broken sheet pile and 33 meters for its elevation as high as 40 centimeters," he told, Tuesday (10/11).
Krukut River will Be Normalized Up to 10 KMHe explains, every rain falls, the street around the school is often inundated up to 40 centimeters. Hence, sheet pile reparation will be followed up by improving the street. Such project is targeted to be complete by the end of this year.